< back
 

 

Extension of Contract

For 10 years now, SCHMIDT is successfully operating PPP and PPC installations (now ONR and ONC facilities) for our customer Basell.

After putting out a new tender, Basell has again opted for SCHMIDT to be their operator and extended the agreement for another 5 years.

51 silos with a volume of 530 m³ ONC and 40 silos for ONR with 530 m³ each for storing and handling an annual volume of 400,000 tons of plastic granulate are available on site.

Inside 2 warehouses (with a total floor space of 16,630 m²) an additional volume of 14,500 tons may be stored as well as another 13,500 tons of material in bags in the open area on the same premises.